Long before the Niagara station came on line, however, Tesla grew restless and left Westinghouse. 不过,早在尼加拉电厂运转之前,特士拉便因为待不下去而离开了西屋公司。
A model for the optimization load allocation among power generating units is proposed by using fuzzy theory and solve it with the improved GA. 通过引入模糊理论提出了电厂机组负荷分配模型,并运用改进的遗传算法进行求解。